SJE 3 Bridge Construction at PT Agro Muko
Back to Project Portfolio
Civil Works including Maintenance Status: In Progress

SJE 3 Bridge Construction at PT Agro Muko

Client: SIPEF Location: Mukomuko Regency, Bengkulu Completed: Jun 2026
SJE 3 Bridge Construction at PT Agro Muko
Main Documentation: SJE 3 Bridge Construction at PT Agro Muko

Project Report & Summary

Construction of the SJE 3 bridge to support plantation operational access.

PT Sumatra Unggul has successfully completed the 'SJE 3 Bridge Construction at PT Agro Muko' works located in Mukomuko Regency, Bengkulu. This project is part of our ongoing commitment to supporting infrastructure development and industrial sector growth across South Sumatra. During execution, our field team faced geographic challenges such as tidal swamp soil conditions and extreme weather. By applying integrated heavy equipment supply-chain management and strict HSE supervision, the works were completed on schedule and to the technical specifications required by SIPEF.

Scope of Work

1. Mobilization and demobilization of heavy equipment units (excavators, dozers, dump trucks). 2. Dredging, filling, and land maturation works. 3. Structural quality supervision and periodic field strength testing.

Key Project Achievements

  • On-time project completion
  • Zero workplace accidents
  • Workmanship passed client quality inspection
  • Efficient heavy equipment and logistics fleet allocation

Project Information

Client Name
SIPEF
Project Type
Civil Works including Maintenance
Location
Mukomuko Regency, Bengkulu
Completion Date
28 June 2026
Work Status
In Progress

Need a Similar Project?

Discuss your construction, heavy equipment, or transportation fleet plans with our team.

Contact Us