PT Sumatra Unggul has successfully completed the 'Sheet Pile Water Intake Construction (Landslide Mitigation) at Umbul Mas Wisesa Palm Oil Mill' works located in South Labuhanbatu Regency, North Sumatra. This project is part of our ongoing commitment to supporting infrastructure development and industrial sector growth across South Sumatra. During execution, our field team faced geographic challenges such as tidal swamp soil conditions and extreme weather. By applying integrated heavy equipment supply-chain management and strict HSE supervision, the works were completed on schedule and to the technical specifications required by SIPEF.
Back to Project Portfolio
Civil Works including Maintenance
Status: Completed
Sheet Pile Water Intake Construction (Landslide Mitigation) at Umbul Mas Wisesa Palm Oil Mill
Client: SIPEF
Location: South Labuhanbatu Regency, North Sumatra
Completed: May 2026
Main Documentation: Sheet Pile Water Intake Construction (Landslide Mitigation) at Umbul Mas Wisesa Palm Oil Mill
Project Report & Summary
Sheet pile water intake construction for landslide mitigation at a palm oil mill.
Field Documentation
Scope of Work
1. Mobilization and demobilization of heavy equipment units (excavators, dozers, dump trucks).
2. Dredging, filling, and land maturation works.
3. Structural quality supervision and periodic field strength testing.
Key Project Achievements
-
✓On-time project completion
-
✓Zero workplace accidents
-
✓Workmanship passed client quality inspection
-
✓Efficient heavy equipment and logistics fleet allocation
Project Information
- Client Name
- SIPEF
- Project Type
- Civil Works including Maintenance
- Location
- South Labuhanbatu Regency, North Sumatra
- Completion Date
- 28 May 2026
- Work Status
- Completed
Need a Similar Project?
Discuss your construction, heavy equipment, or transportation fleet plans with our team.
Contact Us