Tertiary Works Block A on Komering Irrigation Project LCB 5 Package 11
Back to Project Portfolio
Civil / River, Swamp & Coastal Works including Maintenance Status: Completed

Tertiary Works Block A on Komering Irrigation Project LCB 5 Package 11

Client: PT. Nindya Karya (Persero) Location: Muncak Kabau, East OKU Regency Completed: Nov 2025
Tertiary Works Block A on Komering Irrigation Project LCB 5 Package 11
Main Documentation: Tertiary Works Block A on Komering Irrigation Project LCB 5 Package 11

Project Report & Summary

Tertiary works for Block A under the Komering irrigation project.

PT Sumatra Unggul has successfully completed the 'Tertiary Works Block A on Komering Irrigation Project LCB 5 Package 11' works located in Muncak Kabau, East OKU Regency. This project is part of our ongoing commitment to supporting infrastructure development and industrial sector growth across South Sumatra. During execution, our field team faced geographic challenges such as tidal swamp soil conditions and extreme weather. By applying integrated heavy equipment supply-chain management and strict HSE supervision, the works were completed on schedule and to the technical specifications required by PT. Nindya Karya (Persero).

Scope of Work

1. Mobilization and demobilization of heavy equipment units (excavators, dozers, dump trucks). 2. Dredging, filling, and land maturation works. 3. Structural quality supervision and periodic field strength testing.

Key Project Achievements

  • On-time project completion
  • Zero workplace accidents
  • Workmanship passed client quality inspection
  • Efficient heavy equipment and logistics fleet allocation

Project Information

Client Name
PT. Nindya Karya (Persero)
Project Type
Civil / River, Swamp & Coastal Works including Maintenance
Location
Muncak Kabau, East OKU Regency
Completion Date
28 November 2025
Work Status
Completed

Need a Similar Project?

Discuss your construction, heavy equipment, or transportation fleet plans with our team.

Contact Us