Package II. Tidal Swamp Network Rehabilitation, Delta Sugihan Kanan P.23 & P.25 (2,816 Ha), Area A, OKI
Back to Project Portfolio
Civil / Swamp & Coastal Works including Maintenance Status: Completed

Package II. Tidal Swamp Network Rehabilitation, Delta Sugihan Kanan P.23 & P.25 (2,816 Ha), Area A, OKI

Client: BBWS Sumatera VIII SNVT Pelaksana Pengelolaan SDA Sumatera VIII Prov. Sumsel Location: OKI Regency Completed: Aug 2025
Package II. Tidal Swamp Network Rehabilitation, Delta Sugihan Kanan P.23 & P.25 (2,816 Ha), Area A, OKI
Main Documentation: Package II. Tidal Swamp Network Rehabilitation, Delta Sugihan Kanan P.23 & P.25 (2,816 Ha), Area A, OKI

Project Report & Summary

Tidal swamp network rehabilitation in Delta Sugihan Kanan covering 2,816 hectares.

PT Sumatra Unggul has successfully completed the 'Package II. Tidal Swamp Network Rehabilitation, Delta Sugihan Kanan P.23 & P.25 (2,816 Ha), Area A, OKI' works located in OKI Regency. This project is part of our ongoing commitment to supporting infrastructure development and industrial sector growth across South Sumatra. During execution, our field team faced geographic challenges such as tidal swamp soil conditions and extreme weather. By applying integrated heavy equipment supply-chain management and strict HSE supervision, the works were completed on schedule and to the technical specifications required by BBWS Sumatera VIII SNVT Pelaksana Pengelolaan SDA Sumatera VIII Prov. Sumsel.

Scope of Work

1. Mobilization and demobilization of heavy equipment units (excavators, dozers, dump trucks). 2. Dredging, filling, and land maturation works. 3. Structural quality supervision and periodic field strength testing.

Key Project Achievements

  • On-time project completion
  • Zero workplace accidents
  • Workmanship passed client quality inspection
  • Efficient heavy equipment and logistics fleet allocation

Project Information

Client Name
BBWS Sumatera VIII SNVT Pelaksana Pengelolaan SDA Sumatera VIII Prov. Sumsel
Project Type
Civil / Swamp & Coastal Works including Maintenance
Location
OKI Regency
Completion Date
28 August 2025
Work Status
Completed

Need a Similar Project?

Discuss your construction, heavy equipment, or transportation fleet plans with our team.

Contact Us